top of page
Projects at FoHMP
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Fusce et maximus justo. Sed nec rutrum augue. Ut vitae dui tempus tellus gravida facilisis. Phasellus convallis varius ipsum, non convallis tortor sagittis ut. Maecenas sollicitudin ut.

Monitoring the Wetlands and the Yeading Brook
Here is a page showing the work undertaken in the park to help understand the quality of the Yeading Brook running through the park which ultimately becomes part of the River Crane Catchment joining the River Thames at Twickenham.
A large group of stakeholders were and still are involved from the very beginning.
Click on each image below for information from these stakeholders including reports and presentations.
If you would like more specific information from the park monitoring, the actual monitoring data is available as downloadable Excel format data with Graphs
Evidencing the Impact of Constructed Wetlands: Headstone Manor Park
Downloadable map showing the monitoring points in the park
Piloting a citizen science method for monitoring the function of a constructed wetland
Sampling method statement and Risk Assessments
(links to another page)
FOHMP Method statement for using Hannah Checkers and Testing Strips
2025 Monitoring Results
Wetlands only (excel)
2025 Monitoring Results Wetlands and Yeading Brook combined (excel)
2025 Monitoring Results Yeading Brook only (excel)
bottom of page









